Operating Safe Yield established --
The annual hearing on the determination of the Operating Safe Yield
was held in conjunction with Watermaster's regular meeting on May 14.
The Operating Safe Yield for fiscal year 2008-2009 was set at
180,000 acre-feet. (posted 5/15/2008)
Annual Report, Five-Year Plan published -- Watermaster's 35th
Annual Report for fiscal year 2006-2007 has been published and is now
available. As was done last year, a separate executive summary
which excludes the technical appendices has also been published. Watermaster's
annual Five-Year Water Quality and Supply Plan for 2007-08 to 2010-11 has been published
as well. (posted 11/30/2007)
Meeting time change -- Watermaster's monthly board meetings
now begin at 3:00 PM rather than 2:00 PM. (posted 2/2/2007)